Project Manager Toolkit

Four instruments for the delivery decisions that don't have an easy number.

Built from real delivery problems, not a feature checklist. Each one takes a judgement call a delivery lead has to make: what's worth doing, when it will realistically finish, how risky what it depends on is, how the work is actually flowing, and turns it into something transparent and defensible.

Free, no login required, runs entirely in your browser.

One tool per stage of the arc

PrioritizeDecidePlanExecute

Read this first: how these four connect.

Each tool stands alone, but real delivery data moves between them: flow throughput feeds the forecast, and the forecast feeds the WSJF job size. The docs walk through the method behind each one before you use it.

Read the docs
Licensed under CC BY-NC 4.0 · Free for non-commercial use · Attribution required
Latest update · Tools gallery redesign
Decide
Live
Monte Carlo · v2.0

Delivery Estimator

The problem: a PM or tech lead is asked to commit to a date and answers with a single day nobody actually believes.

Runs a 500-iteration Monte Carlo over scope, throughput and named risks and returns P50 / P85 / P95 dates with a confidence score: a distribution you can defend, not a guess.

Allocation
80%
P50
9w
COMMIT
P85
12w13w
P95
15w
Execute
Live
Flow Metrics · flow-method-1.0

Delivery Flow Metrics Analyzer

The problem: a tech lead or delivery lead going into a forecast or retro without an honest read of how the work has actually been flowing.

Drop in a Jira, Linear or Azure DevOps CSV and it returns cycle-time percentiles, throughput trend and WIP aging, plus a seven-family findings engine, every finding cites your own numbers.

Cycle timedays · per item
P95
P85
P50
Plan
Live
Risk Assessment · v2.0

API Risk Assessment

The problem: a tech lead or CTO greenlighting a third-party integration on gut feel, with nothing to hand a stakeholder at sign-off.

Thirty questions across six weighted dimensions produce a score, a risk band and per-answer mitigations, exportable as a PDF you can put in front of a CTO.

LOWMODERATE
6 dimensions
→ mitigations + PDF sign-off
Prioritize
Live
Prioritization · v1.0

Product Prioritization Compass

The problem: a PM or product lead deciding what enters the backlog when the prioritization method quietly decides the ranking for them.

Scores the same backlog with RICE, Weighted Scoring and WSJF at once and surfaces where and why they disagree, plus an agreement score and a suggested method, instead of one ranking to trust blindly.

"Payments SDK upgrade"DIVERGENCE
RICE
#2
Weight
#4
WSJF
#7

© 2026 Víctor Javier Corral Franco · Tools licensed under CC BY-NC 4.0 · Free to use for non-commercial purposes with attribution